Abstract

The pile-beam-arch (PBA) approach is illustrated as a creative construction method in shallow-buried tunneling excavation of subway construction. Attentions have been paid to this method due to its unique advantages of construction technology. Subway station construction by using PBA approach will make disturbance to the ground surface. Research on surface deformation caused by PBA approach is of great significance to the surrounding environment and its structure. The example of subway construction in Beijing is presented as the research background, a three-dimensional model is established by using the Midas-GTS finite element numerical simulation software to simulate the practical excavation support conditions, and to analyze the surface settlement, the initial support structure settlement and crustal stress caused by PBA construction method.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call