Abstract

In recent years, as a powerful supplement to large power grid, microgrid can meet the requirements of new energy consumption and has been applied in many practical projects. In the process of microgrid access to distribution network at present, there are many problems in microgrid and distribution network. Among these problems, the planning of the distribution network substation with microgrid is one of the most important problems to be solved urgently. In this paper, the distribution network substation planning model considering microgrid is established first, including the determination of substation number and the optimization of substation location, in which the principle of equal load moment minimization is selected to establish the substation location model. Secondly, the multiple source continuous method is used to solve the substation planning model. Finally, the feasibility and excellence of the planning model and planning method are verified by a typical distribution network planning example.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.