Abstract

In order to study the lining stress index of hydraulic tunnel, this paper mainly analyzes the safety monitoring data of a hydraulic tunnel, uses ANSYS finite element software for modeling, uses Flac 3D software for numerical calculation, and uses numerical analysis method to develop hydraulic tunnel G1 -18 Stress monitoring indicators for lining of section. The results show that the actual measured value is basically within the control range of the data calculation value. When determining the monitoring index of the steel bar stress, the result of the numerical calculation can be used as the index, but the monitoring index of the top steel bar meter should use the maximum monitoring value as the index.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.