Abstract

In the process of electric power construction, the form of bored pile bottom foundation is widely used. However, if the method of segmental lifting of steel cage is adopted, it will bring a series of problems. First of all, the combination welding of the two main bars will become very difficult, and its welding strength is difficult to be guaranteed. Second, the welding process takes too long, which may lead to an increased risk of hole collapse. These problems will not only affect the efficiency and quality of power construction, but also threaten the safety of construction personnel. Therefore, in order to solve these problems, it is very important to improve the safety and reliability of the overall lifting process of the steel cage. This paper will introduce the research on the whole lifting of steel cage in power construction in detail, in order to provide useful reference for related projects and help the steady development of national power industry.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call