Abstract
This paper presents the interruptible electricity market Stackelberg game model of load under the contract in consideration, and the use of Monte Carlo solves the uncertainty of electric power demand simulation technology, the simulation proved that the interruptible load contract, and the interruption threshold reasonably can reduce the equilibrium price and volatility effect.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: DEStech Transactions on Computer Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.