Abstract
For subway tunneling in urban underground, high safty of construction is needed.However, the safty and rationality of excavating plan are forecasted difficultly because of consealment. Based on the Zhang-Shen tunnel construction of Shenyang subway, bench method, single side-wall heading excavation method and CD excavation method are numerical simulated; according to the numerical calculation results and the constructing process, bench method is adopted; the ground settlement caused by excavation monitored during excavating is in the allowed range and the tunnel is safe during excavating.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.