Abstract
For the manufacturing task of manufacturing collaborative alliances, the relationship between manufacturing task programming and manufacturing resources deployment is analyzed and the model for the span of manufacturing task with time sequence constraint is constructed. The problem of span programming of manufacturing task with time sequence constraint is analyzed by integrating qualitative and quantitative methods from production period for the manufacturing task. The mathematical formulations of influential factors and task span are constructed, and the optimal values of task span are obtained. By analyzing the results of quasi-quantitative study, some meaningful results that benefit to programming for collaborative manufacturing task are achieved.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.