Abstract

Based on the engineering background of Dongkeling tunnel of Guizhou-Guangzhou high-speed rail, construction process in soft surrounding rock is simulated by using finite difference software——FLAC according to large-deformation characteristics in water-rich and weathering altered granite weak surrounding rock. Several aspects, such as vault settlement, invert uplift, clearance convergence, surface settlement, the maximum and minimum principal stress of the initial support and plastic zone of surrounding rock, are analyzed to determine the tunnel stability with different construction methods.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.