Abstract

The Cuu Long basin is equiped with infrastructures and processing facilities serving for large-scale crude oil drilling and production operations. However, most of resevoirs in this area are now depleted, it means that they have reached their peaks and started to undergo decreasing productivity, which lead to a noticable excess capicity of equipment. In order to benefit from those declined oil fieds and maximize performance of platforms, solutions to connect marginal fields have been suggested and employed. Of which, connecting Ca Ngu Vang wellhead platform to the CPP -3 at Bach Ho oil field; platforms RC-04 and RC-DM at Nam Rong - Doi Moi oil filed to RC-1 platform at Rong oil field; wellhead platforms at Hai Su Den and Hai Su Trang oil fields to H4-TGT platform at Te Giac Trang oil field are typical examples of success. Optimistic achivements gained recently urges us to carry out this work with the aim to improve oil production of small reserves and to make best use of existing petroleum technology and equipment at the basin. Results of the research contribute an important part in the commence of producing small-scale oil deposits economically.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.