Abstract

The terminal equipment of the slime treatment system needs to realize that the slime water can be directly recycled or meet the conditions of direct discharge. The slime selection process has two main parts: first, the selection process and second, the product dehydration process. The slime recovery and recovery process has two main parts. The first is coarse slime recovery and dehydration equipment and the second is fine slime recovery and dehydration equipment. The above factors are the necessary conditions to realize the closed circuit of slime water. In these mitigations, the use of computers to complete their work can effectively increase production and this article studies them.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call