Abstract
The quality of road and bridge engineering is directly related to the safety of the transportation industry. In the construction of highway bridges, it is particularly important to strictly control the construction quality. Combining the analytic hierarchy process and the fuzzy comprehensive evaluation method, the AHP-fuzzy comprehensive evaluation method is used to obtain the current road bridge construction safety risk level. According to the different risk levels, effective measures should be taken to avoid unsafe accidents. On this basis, historical risk cases can be analyzed to find problems in the safety assessment of highways and bridges, and effective construction safety management and control measures can be put forward to ensure the vigorous development of my country’s highway and bridge industry.
Highlights
Summary
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.