Abstract

With the impact of global climate change on extreme weather and the rapid expansion of human activity range, the cryogenic freezing rain and snow disaster is becoming more frequent, bringing quite adverse effects on transportation, electric power and other industries, thus seriously affecting social and economic development and people’s daily life. Implementation of risk early warning is one of the most effective means to prevent the cryogenic freezing rain and snow disaster. This paper, taking Guizhou Province as an example, studies the early warning technology and method for the cryogenic freezing rain and snow disaster based on the demand for prevention of the cryogenic freezing rain and snow disaster, and considering meteorological factors, topography, social economy, power transportation and other factors. On this basis, the weight of risk factors is determined by subjective weighting method, the risk early warning model for the cryogenic freezing rain and snow disaster based on AHP is constructed, and the four-level risk early warning indexes are determined. Trial application is realized in Guizhou Province.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.