Abstract

With the deepening of China's reform and opening up and the gradual improvement of productivity level,the production enterprises of construction and decoration panels have gradually sprung up. In order to improve the production efficiency of enterprises and reduce the loss of raw materials, this paper establishes an analytical hierarchical model, and a 0-1 goal programming model. Based on the analysis of the problem, it pays attention to the connection between the questions. A rational solution for ordering and transporting raw materials based on the 0-1 goal programming model is also proposed in conjunction with real-life practice. In this paper, the problem is solved by building several mathematical models and the results are entered in Annex A and Annex B. After the model is implemented and tested, significant improvements are found. In addition, the model is improved by a genetic algorithm so that the model is well applicable and generalizable.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.