Abstract

With a view to the procurement relationship between prefabricated component (PC) production enterprise and its upstream raw material supplier, an MRP-guided collaborative optimization model for order quantity in supply chain was constructed based on the thought of just-in-time (JIT) procurement by following the BOM constraint and MRP principle of PC production. The traditional butterfly optimization algorithm (BOA) was improved by combining Levy flight strategy, mixed mutation operation and simplex method (SM), thus proposing the LMSMBOA algorithm. In a practical case, the model was solved using the improved algorithm, which was then compared with genetic algorithm (GA), particle swarm optimization (PSO) algorithm and unimproved BOA. The results reflect that the LMSMBOA algorithm can obtain more outstanding raw material procurement schemes by solving the collaborative material procurement model in supply chain between PC production enterprises and upstream raw material suppliers.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.