Abstract

According to the questions of long eliminating coal and gas outburst period, large projects and slow driving came from the regional measurement of drilling hole ,the paper select 2371 (1) rail transport roadway as experiment for using along seam long drilling as a regional measurement to eliminate coal and gas outburst. Since the regional measurement of along seam long drilling had been carried out, the remaining gas content decreased more than 60ï¼…, max Smax was 5.4kg/m, max qmax was 2.01/min.Both Smax and qmax were not beyond the standard. Gas concentrations were not overrun. Gas emission decreased in the roadway afterward. The regional measurement eliminated the risk of coal and gas outburst in effect. Heading face promoted 423m forward safely. The max January footage could reach 120m.Achieve driving of heading face safely and fast.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call