Abstract

The problems of construction period, quality and coordination between road construction and maintenance and road traffic often exist in the process of traditional urban road construction. The development of urbanization has brought about the rapid expansion of urban roads, and the changes in the permeability of urban underlying surface have also brought about urban waterlogging and urban water security problems. Making full use of the environmental protection, high efficiency and economic characteristics of the prefabricated process, through data investigation, theoretical calculation and mechanical analysis as the main means, the prefabricated prefabricated road base is studied and designed, drawing on the stress characteristics of the raft foundation of the building structure and the concept of beam and slab force transmission, forming the prefabricated beam and slab base in the form of raft structure, taking into account the actual drainage capacity of the urban pipe network and the outdoor drainage regulations, and setting drainage holes and gravel layers, Make the prefabricated road base have the function of organized drainage and water storage at the peak of runoff, so as to alleviate urban waterlogging to a certain extent and solve urban water safety problems.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call