Abstract

Bidding evaluation is an important aspect in equipment procurement, and there are still some problems with the current bidding evaluation method being used. This paper presents a bidding evaluation method which combines the entropy-weight method and the ELECTRE method to create a new bidding evaluation model. Finally, the application of this bidding evaluation method in power equipment purchase is illustrated by using thermal power auxiliary equipment bidding procurement as an example.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call