Abstract
Constant flow pumping test is finished in the 7th shaft tunnel of Humaling,based on the measured data,permeability coefficient of tertiary system sandstone is calculated by using Boulton formula wiring method,lining method and water level recovery method.The value is 0.14~0.23 m/d,Providing a reliable basis for further engineering application.Compared this data with that permeability coefficient calculated by J.Dupuit method when pumping stability.The conclusion is that there have a critical value,the latter numerical value greater than the former when the distance of observation well and pumping well less than critical value,and gradually become smaller than the former with the distance of observation well and pumping well increase and greater than critical value.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.