Abstract

The principle and step of performance evaluation of project management based on SVM and fuzzy rules are studied. The index system of performance evaluation of project management is set up. Then we built up the evaluation model on SVM and fuzzy rules. Finally, take some samples of project for an example, we carry on this model to instance. It can take a preferably evaluation, so that it is a viable method.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call