Abstract

The Passive Planning and Design is used in the new campus of the first senior middle school in Maoming city, Guangdong province, China. Oriented by regional climate, the design has beneficially explored the way of implementation of green campus in Subtropical Region. During the whole design process, the Computer Simulation Environment technology is combined with the regular design methods, cooperating with multi professional fields such as planning, architecture, landscape and pyrology. After building energy consumption calculation, the goal of energy conservation and environmental protection is achieved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.