Abstract

With the enlargement of production scale and the increase of survey and adjustment work, the mismatch between test requirement and test capability becomes more and more serious. In order to further control the test cost and improve the efficiency of survey and adjustment, according to the characteristics of the peripheral oil reservoirs and sections, differential management of survey and adjustment cycle and effective methods of matching injection points are actively carried out, on the basis of satisfying the development requirements and smooth operation of various indexes, solve the mismatch between test requirements and test capabilities. By analyzing the use cycle of test data under different conditions, the type of wells with extended use cycle is determined, which can effectively reduce the need of test work under the condition that the separate layer water injection is qualified. The distribution rules of different sizes of nozzles are statistically analyzed, and the selection rules of nozzles in special layers are made clear in advance to improve the debugging efficiency of injection allocation point.

Highlights

  • In recent years, on the premise of the decrease of drilling scale, the production is increasing year by year, and the quality of water injection is required to be improved continuously

  • In order to push forward the water injection work in the oilfield of "enough water injection, good water injection, fine water injection and effective water injection", it is required that the passing rate of testing in separate water injection wells should reach over 98%, and the passing rate of separate water injection should keep above 90% and run smoothly, the separate layer adjustment technique of water injection well is the main method to measure and adjust the water absorption of formation, and the main factor that affects the separate layer water injection qualified rate decides the operation of separate layer water injection qualified rate index[1]

  • Differential management of test cycle and improvement of debugging efficiency are the main methods to solve the problem of mismatch between test requirement and test capability

Read more

Summary

Introduction

On the premise of the decrease of drilling scale, the production is increasing year by year, and the quality of water injection is required to be improved continuously. In order to push forward the water injection work in the oilfield of "enough water injection, good water injection, fine water injection and effective water injection" , it is required that the passing rate of testing in separate water injection wells should reach over 98% , and the passing rate of separate water injection should keep above 90% and run smoothly, the separate layer adjustment technique of water injection well is the main method to measure and adjust the water absorption of formation, and the main factor that affects the separate layer water injection qualified rate decides the operation of separate layer water injection qualified rate index[1]

Principle of layering survey and adjustment technology
Optimizing the adjustment period of single well logging
Findings
Conclusion

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.