Abstract

This paper proposes a distribution grid network planning model based on improved particle swarm optimization algorithm with planned interruption non-effect load fluctuation uncertainty, and studies the distribution network reconstruction and distribution network fault isolation recovery. Through simulation, it is found that the improved particle swarm optimization algorithm enhances particle diversity, accelerates convergence, and has good global search ability. It is feasible and effective, and has positive significance for promoting the application of PSO in power systems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.