Abstract

Mining is a continuous process of continuous change and development, and mine ventilation systems are an important part of the process. Mining is a continuous process of continuous change and development, and mine ventilation systems are an important part of the process. Additionally, the mining process is constantly evolving and innovating. Despite the improvements in technology, there are still some problems with the current mine ventilation system, including its hardware structure and design control. It is necessary to improve and solve these problems. An approximate optimization algorithm is used to improve the ventilation pipes and air network in the mine ventilation system to solve the problem of the unreasonable ventilation system design. It is also designed to meet the corresponding requirements in terms of return air section resistance and air supply route resistance. Efforts are made to improve the mine ventilation system's performance, and the system's main air supply branches are optimized to increase their efficiency.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call