Abstract

With the emergence of asymmetric long-span suspension bridge, it is necessary to study the optimization of hoisting sequence of the main girder of this type of suspension bridge. According to the relationship between the lifting sequence of the main girder and the pushing scheme of the pylon, the method flow of optimizing the lifting sequence of the main girder of the asymmetric long-span suspension bridge is given. Taking an asymmetrical long-span suspension bridge in Guangdong Province as an example, this method is used to optimize the hoisting sequence of the main girder and put it into practice. Good results are obtained and verified: the hoisting of the main girder should be carried out from the middle of the span to the two pylons, and the hoisting speed of the middle side span should be consistent with the proportion of the standard beam sections of the middle side span, and the maximum allowable deviation of the pylon and the main girder should be used in the jacking scheme of the pylon The hoisting sequence shall be formulated based on. It can provide a useful reference for the hoisting of the main girder of the same type suspension bridge and the suspension bridge with slings on both sides of the bridge.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call