Abstract

Product tending machine (PTM) is one of the most important equipment in the aluminum electrolysis production process, for the problem of PTM optimization, a queuing system model of aluminum electrolysis PTM is proposed for the first time. According to the actual production situation of the aluminum electrolysis industry, a non-preemptive priority M/G/1 aluminum electrolysis PTM queuing system model is defined, and the general calculation formula of the operating index of the non-preemptive priority PTM queuing system is given, including queuing system length, waiting time, optimal service rate, etc. According to the actual production data of an aluminum factory, the relevant indicators were calculated and analyzed, and the relationship between the operating indicators and the number of electrolysis cells was drawn. Finally, under the conditions of meeting different operating indicators, the optimal matching scheme of PTM and aluminum electrolysis cells was given.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.