Abstract

For the purpose of early discovering of tank zone oil spill accidents and making up the shortfall, the fuzzy comprehensive evaluation method was used to construct the oil spill risk fuzzy comprehensive evaluation model. Firstly, the historical data of oil spill accidents in China National Petroleum Corporation (CNPC) was collected and analyzed, and the questionnaire was conducted to the field staff and managers to select and confirm the evaluation factors. Secondly, the analytic hierarchy process (AHP) combined with experts scoring method was used to set the weight of each factor. Lastly, the fuzzy factors were quantified based on the membership function to determine the risk factors matrix. The oil spill risk of CNPC port was researched as a case study, the result of which is V= 3.85, indicating that the state of the tank zone is approximately well. The result and conclusion consist with the actual conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call