Abstract
With the analysis on regulating system in 200 MW steam turbine, the necessity of appending the fast-opening function to the original system is set forth and a new type of fast-opening mechanism is devised. The mathematical model of system is built up. With the use of AMESIM software, the displacement curve of the piston, the force curve of the cartridge valve spool, the pressure curve and the flux curve in the regulation process are obtained based on simulation. The performances of three fast-opening systems composed of cartridge valves with different diameters are compared. Based on the analysis on factors that affect the execution time of fast-opening, the dead zone of the fast-opening system is put forward. To overcome the defect, different operation modes are adopted for different zones. The result shows that with the increase of the valve diameter, the regulating time in the dead zone significantly exceeds the fast-opening time in the whole journey. Accordingly, the optimization operation tactic in the dead zone and the qualification conditions are brought forward. The fast-opening system composed of 32 mm cartridge valves is taken as an example with use of the tactic. The simulation result shows that the maximum regulating time is shortened by 509 ms.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.