Abstract

Under the background of "double carbon" target, the problem of new energy consumption is increasingly prominent.First, this paper summarizes the research situation, on this basis, in an example, further put forward the specific problem of new energy consumption, at the same time, combining theory and practice, build the new energy timing production model, according to the "difference" during the power grid planning and construction, respectively at the end of 2025 new energy installed reached 50 million kilowatts and 70 million kilowatts as the goal, calculate new energy consumption capacity. After completing the calculation of each annual basic case under deterministic boundary conditions, the impact of the increase of peak adjustment capacity on the measurement results of new energy consumption is then analyzed.Finally, through the above calculation of the new energy consumption capacity, the corresponding measurement results are obtained under the deterministic boundary conditions.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.