Abstract

In this paper classic static and dynamic scheduling strategy is analyzed first, and then communication network of schedule ability judgment basis is given. An improved dynamic EDF scheduling algorithm is proposed in order to improve the scheduling task of real-time. The scheduling strategy is to change task priority according to the transmission error over deadline task when applying dynamic EDF scheduling strategy. True Time tool is used to build CAN network control system simulation platform. Dynamic EDF scheduling algorithm and improved scheduling algorithm are simulated respectively. The effectiveness of improved scheduling algorithm is verified by the simulation Keywords-Network control system; Scheduling Algorithm; True Time toolbox result.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.