Abstract

According to problems existed in the current farm machinery scheduling process, a new farm machinery scheduling scheme is adopted in this dissertation. The collaborative scheduling model of farm machinery is established and multitask collaborative scheduling algorithm is designed through analyzing the differences between Vehicle Scheduling Problem and agricultural machinery scheduling in the dissertation. Earliest Start Time First and minimal resource allocated capacity first strategies are used in the farm machinery scheduling. The algorithm is useful for the case of machinery owner with sufficient farm machinery. The experiment proves that the collaborative scheduling algorithm is more effective than the serial scheduling algorithm.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.