Abstract
Research and analyze the multi-thread schedule methods of the adjusted pressure casting control system deeply. Present an analysis method of related slice graphs based on the code slice and a theory of code subdivision based on the slice granularity and time slice. Then strictly divide the program of control system based on the time slice and obtain the strategies of event driven schedule and time slice schedule by analyzing the casting system. Subsequently, subdivide and recombine the multi-thread program slices based on the priority of the schedule strategies in control system. The control system was applied to the TYM-1 adjusted pressure casting system and the preferable effect is acquired.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.