Abstract
With the deepening of external power transmission and distribution price reform and other policies, the work program of “optimize operation and management strategy, promote quality and efficiency development” within the power grid company has put forward clear requirements for the coordination of multiple majors, such as planning, construction, transportation and inspection, and materials. Starting from the actual management demand of investment chain, we build collaborative control standards of investment, standard control model, the innovative power grid construction project investment in multi-dimensional closed-loop control mode, and apply it to the investment management process, in order to extend investment value management to business terminals, constantly improve the management of scientific, validity and accuracy, and assist the company in multi-dimensional lean management and control.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.