Abstract

In allusion to the special environment of coal mine roadways, the strategy laying anchor nodes evenly on the left and right sides and the top of roadways in accordance with the oblique triangle and the mine personnel positioning algorithm based on received and transmitted signal strength of nodes were adopted in the paper. The algorithm estimating the distance between an unknown node and an anchor node through built-in received and transmitted signal strength information of the anchor node could realize the mine personnel positioning with only two anchor nodes. Both theoretical analysis and simulation experiments show that it improves the personnel positioning accuracy in the coal mine roadway environment effectively used the effective combination of the nodes arrangement strategy and the positioning algorithm proposed in the paper.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.