Abstract

When mining close-distance seams with downlink mining, in order to benefit roof maintenance and management, the decoration of lower seam roadways should try to avoid the area affected by pillar concentrated stress , using inside cross decorationg; In order to improve the recovery rate of resources, the size of protection pillar can’t be too big, when mining under pillar of upper layer and mining in pillar of upper layer with crossing. The whole lower face or some phase located under the influence of upper coal concentration stress, give roadways and working face roof maintenance a lot of difficulties. Then it appeared the conflict between security and economy, to solve this problem, we must return to the correct understanding of mine pressure behave law. In the paper, through the investigation of the typical dozen example in mining of face the coal pillar in China, to get its regular pattern of mine pressure behave, in similar conditions mining, there will be important reference and guidance.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call