Abstract
In order to reduce both uneven settlements and construction duration, researches on pile-supported composite foundation of highway were carried out. When the groundfill is higher than the critical height(1.35 times space between piles), a complete geostatic arch is formed in the pile-supported composite foundation, which could significantly reduce the uneven settlement. Grids installed at the bottom of embankment could markedly reduce the side displacement and increase the stability of embankment, multilayer grids with layout of loose on the top and dense at the bottom prefer to single layer grids. Plastic drainage board makes up well-functioned drainage system, which can shorten the dispersal time of pore water pressure and accelerate the consolidation of soft soil to shorten the construction duration.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.