Abstract

It is believed that the agility can be realized by dynamically optimization deployment of networked manufacturing resources. To solve this problem, logical manufacturing unit (LMU) and logical manufacturing process (LMP) are proposed and defined to decompose and model networked manufacturing task according to the process of complex part. When selecting manufacturing resources for these manufacturing tasks, many factors should be taken into account. However, manufacturing cost, time to market and manufacturing quality are the most important factors. In this paper, networked manufacturing resources pre-deployment is carried out to find candidate manufacturing resources based on manufacturing resources abilities, such as part family, geometric feature, material type, rough type, dimension range, machining method, precision grade and production type. Then, taking transportation time and cost besides manufacturing time, cost and quality into consideration, the objectives and restrictions of manufacturing resources optimization deployment are analyzed, and manufacturing resources optimization deployment problem is considered as a multi-objectives optimization problem.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.