Abstract

Keywords: lightning invasion wave, EMTP-ATP, lightning protection, arrester arrangement. Abstract. To ensure safe and reliable operation of the substation, avoid the equipment damage caused by lightning wave invasion, which threats the safe operation of power system, it is necessary to research the influence factors of the substation lightning overvoltage and lightning protection measures. Taking a 500kV HGIS substation as the research object, a simulation model is established. Based on EMTP-ATP, this paper simulates the lightning striking the top of the tower and back-flashover occurring at the coming line of transmission line. Based on the principle of single variable, the factors which affect lightning overvoltage amplitude was studied, the change rule of amplitude was summarized. By configuring the quantity of arrester and the location of installation, through simulation, it determined that installing arresters at the line entry and GIS bus is the most reasonable lightning protection scheme.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.