Abstract

Techniques of lifting large segments of steel box girder by floating crane is used in construction of Chongqi Bridge. Considering the hydrological environment on the site, characteristics of steel box girders and performance parameters of floating crane, the selection of floating crane is carried out. To ensure hoisting work achieve function and safety, a new type of lifting device named Self-balance lifting device is designed, and the lifting-points design is optimized to make the reaction of all lifting-points of large segments equal. In the erection process of large segments, the security risk control is analyzed to ensure the steel box girders and lifting equipments safety.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.