Abstract
This paper takes BIM as the platform and system dynamics as the research method, establishes the life cycle cost control model of prefabricated buildings, draws causality diagram and flow inventory diagram by Vensim software, obtains the main influencing factors of assembly building cost control, and then gives the cost control measures. In this paper, BIM, prefabricated building and system dynamics are combined to study the cost control of prefabricated building from a new perspective, and reasonable suggestions are given to provide new ideas for promoting the development of prefabricated building in China.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.