Abstract

With the continuous promotion of power market reform, the trading mode of power market is constantly enriched. In this context, the virtual power plant technology breaks the traditional “source grid load storage” boundary, and realizes the multi-energy complementary and multi-source interaction of the power system, but the resource utilization strategy for the virtual power plant is not enough. Therefore, starting from the composition of virtual power plant, this paper constructs the internal resource quality evaluation system of virtual power plant. Based on the division of resource quality, the cascade utilization strategy of virtual power plant resources is provided. The practical results show that the quality evaluation of internal resources of virtual power plant is helpful to classify the internal resources of virtual power plant, help them realize the cascade utilization of resources, and maximize the economic benefits of virtual power plants.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call