Abstract

A real-time monitor for 3D reactor power distribution is critical for nuclear safety and high efficiency of NPP’s operation as well as for optimizing the control system, especially when the nuclear power plant (NPP) works at a certain power level or it works in load following operation. This paper was based on analyzing the monitor for 3D reactor power distribution technologies used in modern NPPs. Furthermore, considering the latest research outcomes, the paper proposed a method based on using an ex-core neutron detector system and a neural network to set up a real time monitor system for reactor’s 3D power distribution supervision. The results of the experiments performed on a reactor simulation machine illustrated that the new monitor system worked very well for a certain burn-up range during the fuel cycle. In addition, this new model could reduce the errors associated with the fitting of the distribution effectively, and several optimization methods were also obtained to improve the accuracy of the simulation model.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call