Abstract

Hydropower is the largest clean and low-carbon renewable energy, which can generate electricity with comprehensive utilization functions such as flood control, water supply, shipping and irrigation, and has significant social, ecological and economic benefits. However, at present, the progress of intelligent construction of hydropower enterprises is relatively slow, and the theoretical and strategic research is still relatively weak, resulting in low management efficiency and low degree of production visualization. How to carry out intelligent enterprise construction for traditional hydropower enterprises, improve the management level of enterprises and better adapt to the competitive environment of power market is a major research topic for hydropower managers. This paper mainly expounds the necessity, strategic framework and overall construction scheme of intelligent construction of hydropower enterprises. Through the application of new technologies such as cloud computing, big data and Internet of things, an efficient and scalable unified data management and analysis platform is established to provide guarantee for safe, economic, efficient and intelligent operation of hydropower enterprises and provide basis for command and decision-making.

Highlights

  • With the rapid development of cloud computing, big data, Internet of things and artificial intelligence technology, hydropower enterprises have gradually developed to the direction of interconnection, data mining, intelligent decision-making, panoramic display, etc., and the development of intelligence has become the general trend [1]

  • The intelligent construction of domestic hydropower enterprises is faced with many difficulties [2]

  • This section mainly introduces the strategic framework for smart construction of hydropower enterprises [4]

Read more

Summary

Introduction

With the rapid development of cloud computing, big data, Internet of things and artificial intelligence technology, hydropower enterprises have gradually developed to the direction of interconnection, data mining, intelligent decision-making, panoramic display, etc., and the development of intelligence has become the general trend [1]. The intelligent construction of domestic hydropower enterprises is faced with many difficulties [2]. The main problems are the wide distribution points of hydropower stations, bad natural environment, low degree of intensive and intelligent power stations, difficulties in transformation, difficulty in operation and maintenance, and difficulty of data sharing. This paper will introduce the realization process and overall structure of the intelligent construction of hydropower enterprises from the aspects of the necessity of intelligent construction, strategic framework of intelligent construction and the overall scheme design of intelligent construction

The necessity of intelligent construction of hydropower enterprises
Strategic framework of intelligent construction of Hydropower Enterprises
Overall scheme design for intelligent construction of Hydropower Enterprises
Overview

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.