Abstract

The most direct impact is that it is difficult to carry out excavation, calculation, support and other geotechnical engineering design work directly based on the three-dimensional geological model according to the building layout requirements. The internal reason is that the geotechnical engineering design work involves both irregular geological objects and regular structural objects The description of the two objects involves different basic theories and algorithms, computer graphics technology and user’s operating habits, and there are natural “technical barriers”. The research and development of the integrated three-dimensional system of geotechnical engineering analysis and design starts from the bottom technology. It adopts two kinds of algorithm theory of “discrete” and “continuous”, two kinds of program data structure of nonparametric and parametric, “double engine” technology of two operation modes of “uncertainty” and “determination”, and embeds mechanical calculation engine to carry out mechanical analysis and calculation for geological body structure, which meets the requirements of rock mass. The design of soil engineering needs, and fundamentally solves the interface problem of Geology and structure.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.