Abstract

There are obvious differences between the assembly construction method and the traditional cast-in-place construction. At present, the assembly construction technology and management standards have not been perfected in our country, and the acceleration of technology can create unparalleled cascades of benefits as well as new risks of catastrophe. Through a lot of literature research, this paper designs questionnaires including risk perception, convenience perception, managerial pressure, co-worker pressure, and judgement ability based on the theory of planned behavior, and conducts factor analysis on the collected data. Finally, based on the analysis results, corresponding management level factors, workers level factors and self-perception factors of unsafe behaviors in prefabricated buildings are proposed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.