Abstract

A simply strategy for monitoring the corrosion process via the peak-to-peak amplitude of ultrasonic guided waves is performed to capture the initial and cover cracking stage of reinforced concrete. In this study, the accelerated corrosion process of steel in concrete is traced, and three factors (steel type, water-to-cement ratio, and concrete cover thickness) are investigated and analyzed. The results show that the amplitude variation can obey a similar pattern that the minimum value (valley) can identify the initial cracking while the maximum value (peak) can represent the cover cracking condition. Moreover, the steel type shows little effect on the amplitude value, but the higher water-to-cement ratio and the thicker concrete cover thickness can significantly decrease the amplitude value in each monitoring period. This study indicates the potential application of the ultrasonic guided waves amplitude for monitoring the corrosion process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.