Abstract

The accuracy of flowmeter of the first circuit coolant sampling system in nuclear power plant affects the measurement of the Boron meter. If the fault treatment cannot be completed in time, the reactor state needs to be withdrawn, which will affect nuclear safety and cause great economic losses. In this paper, a feasible improvement scheme is proposed by analyzing the causes of instrument failure, researching the optimization direction, and adopting measures such as seismic analysis, prototype verification, split design, and interference suppression, which effectively improves the reliability of nuclear sampling flow measurement in nuclear power plants.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.