Abstract

It is usually difficult to establish an accurate mathematical model for hydraulic servo system because of its complicated and non-linear properties. However, bond-graph method has its unique advantages in modeling such as processing multiple energy conversions. Furthermore, good results could be achieved by combining fuzzy control with normal PID control. As a result of air current load interfering with the system in changeable and complicated environment, process control is obviously important. Taking 1MW wind turbine pitch-control system as an example, a simulation research based on the above method is conducted.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.