Abstract
In view of the management characteristics of highway engineering, it integrates BIM, mobile Internet, cloud computing, Internet of things and other technologies to study and establish a fine and collaborative management platform for project progress, quality and safety on the basis of mobile terminal application. This paper realize the dynamic control of project construction resources with progress as the main line and the collaborative management of projects with safety and quality as the core. It can meet the application analysis demands of all parties involved in the construction of highway for the whole service data, and give full play to the convenience of mobile terminals, and carry out task coordination and mobile operation of various management work in time through the mobile terminal anytime and anywhere. At the same time, the data of the mobile terminal is associated with the structure through BIM model, which can be statistically analyzed and visually displayed, and realize the collaborative association of various business data, thus greatly improving the refined management level of highway engineering construction.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have