Abstract

With the intensification of competition among construction enterprises, more and more construction companies have paid attention to and adopted different cost control measures, but the effect of cost control is lacking. At present, enterprises lack evaluation index system that can be used or can be referenced. Combining with the theory of value chain, this paper first analyzes the value chain of construction enterprises, and then designs a set of project cost control evaluation index system, which includes 6 first-level indicators and 21 second-level indicators. It includes not only indicators that are easy to quantify, but also indicators that are not easily quantifiable. The analytic hierarchy process is used to weight the indicators, and the fuzzy comprehensive evaluation method is used for evaluation. This method is suitable for the construction enterprise to evaluate the project cost control effect.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call