Abstract
In order to reasonably reduce the cost of project, and reduce the duration of project, the engineering project time–cost must be optimized. The paper concludes the project time - cost optimal solution, by establishing programming model of project time–cost nonlinear relation, and using particle swarm optimization algorithm to achieve progress optimization. And using an example shows that this optimization method is the feasibility and practicability in solving engineering project time–cost of nonlinear optimization.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.